Battery Energy Storage Systems (BESS)

LCP have the experience to ensure your Battery Energy Storage Systems (BESS) project will meet all planning noise requirements set by the Local Authority

Specialist acoustic consultancy services for Battery Energy Storage Systems (BESS)

Data required
Sound power levels of the plant
External noise criteria
Site plans and plant drawings

Outcome
Noise levels of the plant calculated and compared with criteria using 3D noise maps
Recommend noise mitigation if required
A report demonstrating compliance for planning purposes

Related services
Background noise survey (day or night) or background noise survey (unattended)
Acoustic commissioning testing
Sound power level testing

Discover how to make your buildings quieter